1 cuota de $550.124 sin interés | CFT: 0,00% | TEA: 0,00% | Total $550.124 |
2 cuotas de $339.921,62 | Total $679.843,24 | |
9 cuotas de $104.242,39 | Total $938.181,47 | |
12 cuotas de $88.890,87 | Total $1.066.690,44 |
3 cuotas de $236.846,72 | Total $710.540,16 | |
6 cuotas de $130.021,81 | Total $780.130,84 | |
9 cuotas de $97.292,49 | Total $875.632,37 | |
12 cuotas de $79.680,88 | Total $956.170,52 |
3 cuotas de $237.616,89 | Total $712.850,68 | |
6 cuotas de $138.181,98 | Total $829.091,88 |
INCLUYE
- 9 Tubos largos de 1/4": 4,5,6,7,8,9,10,ll,12 mm.
- 11 Tubos de 1/4": 4,4.5,5,5.5,6,7,8,9,10,ll,12 mm.
- 14 Puntas con base: Tl0,15,20,25,27,30,T40 mm. (x2)
- 2 Barras de extensión de 1/4": 2"y 4"
- 3 Juntas universales: 1/4",3/8", 1/2"
- 1 Mango de 1/4"
- 3 Crickets: 1/4",3/8",l/2"
- 8 Puntas torx de 3/8": E8,El0,Ell,El2,El6,El8,E20
- 10 Tubos largos de 3/8": 8,9,10,11,12,13,14,15,17,19 mm.
- 12 Puntas de 3/8": 8,9,10,ll,12,13,14,15,16,17,18,19 mm.
- 2 Saca bujías de 3/8": 16, 21mm
- 2 Barras de extensión de 3/8": 3"& 10"
- 20 Puntas de 3/8": PZ1,2,PH1,2,Hex3,4,5,6 Torx:TlO
- 1 Adaptador de 3/8"
- 1 Adaptador de 1/2"
- 4 Tubos de impacto: 17,19,21,23 mm.
- 11 Puntas de 1/2": 14,17,18,19,20,21,22,24,27,30,32 mm.
- 9 Tubos largos de 1/2": 12,13,14,15,17,18,19,21,22 mm.
- 2 Barras de extensión de 1/2":5" y 10"
- 1 Adaptador: 3/8"(M)*l/4"(H)
- 10 Llaves combinadas: 8,9,10,11,12,13,14,17,18,19 mm.
- 3 Crickets: 12,13,14 mm.
- 9 Llaves allen: 1.5,2,2.5,3,4,5,6,8,10 mm.
- 1 Alicate de acero al carbono: 8"
- 1 Alicate de acero al carbono, punta larga: 611
- 2 Destornilladores de acero al cabono: cruz 2*38 MM, plana: 6*38 MM
- 2 Destornilladores de acero al cabono: SL6*100,PH2*100 MM